Utility-scale, engineered like utilities do.
From site selection to grid connection — we build ground-mount solar power stations that deliver on yield, uptime, and bankability.

One contract. One throat to choke.
Utility-scale solar goes wrong when the land guys don't talk to the electrical guys, who don't talk to the SCADA guys. We do all four in-house, so nobody gets to point at anyone else.
Site & yield study
PVsyst modeling, land survey, environmental clearance, grid capacity check.
Detailed design
Structural, electrical, protection and SCADA architecture — stamped by licensed engineers.
EPC & commissioning
Procurement, civil works, MV/HV substation, and grid tie-in — one crew, one program.
Long-term O&M
Preventive maintenance, string cleaning, 24/7 monitoring, guaranteed uptime SLA.
Specs that survive technical due diligence.
Every choice below has been signed off by lenders on prior projects. If your financing partner has a technical checklist, we've probably already answered it.
| Capacity range | 500 kW – 20 MW+ |
| Modules | N-type bifacial, 585–605 W |
| Trackers | Fixed-tilt or single-axis tracker |
| Inverters | Huawei / Sungrow central + string |
| Substation | Up to 110 kV interconnection |
| Monitoring | SCADA + PPC with grid-code compliance |
| Yield | 1,650–1,850 kWh/kWp/yr in Armenia |
Unlevered IRR 12–16%
Typical returns for licensed producers under Armenia's autonomous producer regime. Higher with debt, materially higher with corporate PPAs.
Grid-code compliant, day one
Reactive power control, LVRT ride-through, and remote curtailment per ENA's 2023 grid code. We handle the compliance testing.
The best irradiation in the region
Ararat plain hits 1,850 kWh/kWp/yr — better than Andalusia, better than Rajasthan. The physics are on your side here.
Ready to cut your bill by 90%?
Our engineers will visit your property, measure your roof, and hand you a detailed proposal — completely free.