— Since 2013 · Yerevan

Four engineers, one stubborn idea.

In 2013, Armenia had roughly 100 kW of grid-connected solar. Total. In the whole country. We knew, sitting in our office on Komitas that November, that the physics didn't justify that number — 300 sunny days, cheap land, expensive imported gas — and that somebody had to start.

So we did. First install was a 6 kW rooftop for a friend's parents in Nor Nork. It's still running. We check on it every spring.

Twelve years and 512 systems later, we're still the same team — larger, slightly greyer — with the same rule: never install anything on someone else's house we wouldn't put on ours.

0+
Installations
0 MW
Deployed
0 yrs
In business
0k t
CO₂ offset / yr
Twelve years, one office

A decade of firsts — most of them small.

Scroll through the moments we still tell new hires about on their first day.

  1. 2013

    A rented office on Komitas

    Four of us, one whiteboard, and a stubborn belief that a country with 300 sunny days shouldn't be importing gas to boil water.

  2. 2016

    The Gyumri bakery

    Our first 100 kW rooftop. The owner still sends us photos every August of his production graph. It's outperforming the model by 4%.

  3. 2019

    Crossing 1 MW

    We celebrated with khorovats on the roof of the office. Also the year we built the monitoring dashboard every customer now uses.

  4. 2021

    Our first station

    5 MW on the Ararat plain. Twelve months of paperwork, four months of building, and a photograph nobody in the office will ever delete.

  5. 2024

    Installation №500

    A retired teacher's home in Vanadzor. Same handshake, same checklist, same coffee afterwards as install №1.

On paper

The certifications that let us sleep at night.

None of these are marketing decorations — each one is a specific promise, backed by a specific auditor.

PSRC installer license

Issued by Armenia's Public Services Regulatory Commission — required to legally grid-connect any system above 5 kW. Four of our engineers hold personal licenses on top.

ISO 9001:2015

Every install follows a 47-step written checklist that TÜV audits us on annually. Boring, unglamorous, and the reason nothing has ever come loose.

Ingosstrakh all-risk cover

Full builder's insurance during install plus 25-year professional indemnity. If something we did causes a claim in 2049, someone is still on the hook for it.

Free Site Assessment

Ready to cut your bill by 90%?

Our engineers will visit your property, measure your roof, and hand you a detailed proposal — completely free.

Get Free Quote